Quick Links
Planning Application Documents
Navigate through the folders below to find the document(s) of interest.
Please note, some of the documents on this page are very large (100Mb+). Consequently, they may not open through a web browser. If you are experiencing problems opening a particular document you can download it instead by right clicking and saving the document. PDFs opened by left clicking will do so in a new window or tab.
- Application Forms and Cover Letter
- Application forms.pdf (revised June 2010)
- Covering Letter.pdf
- Documents
- Affordable Housing & Viability
- Affordable Housing Briefing Note.pdf (July 2010)
- Appropriate Assessment Screening Letter
- Appropriate Assessment Screening Letter.pdf (June 2010)
- Consultation & Engagement Addendum
- Consultation and Engagement Addendum.pdf (July 2010)
- Design and Access Statement
- Design and Access Statement - Chapter 1.pdf (revised July 2010)
- Design and Access Statement - Chapter 2.pdf (July 2010)
- Design and Access Statement - Chapter 3.pdf (July 2010)
- Design and Access Statement - Chapter 4.pdf (revised July 2010)
- Design and Access Statement - Chapter 5.pdf (revised July 2010)
- Design and Access Statement - Chapter 6.pdf (revised July 2010)
- Design and Access Statement - Chapter 7.pdf (revised July 2010)
- Design and Access Statement - Chapter 8 & 9.pdf (revised July 2010)
- Design and Access Statement - Appendix 1.pdf (July 2010)
- Development Specification
- Development Specification.pdf (revised June 2010)
- Ecological Impact Assessment
- Ecological Impact Assessment.pdf (June 2010)
- Economic Impact Assessment
- Economic Impact Assessment.pdf (June 2010)
- Environmental Statement
- Volume 1 - Non-Technical Summary
- Volume 2 - EIA sections
- 1-5 Introductory Sections
- 6 Traffic and Transportation
- 7 Air Quality, Dust and Odour
- 8 Noise and Vibration
- 9 Daylight, Sunlight and Overshadowing
- 10 Wind
- 11 Townscape and Visual
- 11. Townscape and Visual.pdf
- Supplementary_Townscape_and_Visual_Information.pdf (June 2010)
- Table 11.0 Significance Matrix.pdf
- Table 11.0 Significance Matrix for Effects on Townscape Character and Features.pdf
- Table 11.1 Significance Matrix for Visual Effects.pdf
- Figures
- Figure 11.0 Townscape Planning Context.pdf
- Figure 11.1 Landscape Character Context.pdf
- Figure 11.2 Local Townscape Character Areas.pdf
- Figure 11.3 Townscape Receptors and Sensitivity.pdf
- Figure 11.4 Visual Context.pdf
- Figure 11.5 ZVI Existing Situation (3D Visualisation).pdf
- Figure 11.6 Visual Envelope of the Dock Edge.pdf
- Figure 11.7 Visual Envelope of the Dock Buildings and Structures.pdf
- Figure 11.8 Liverpool Skyline.pdf
- Figure 11.9 Wirral Skyline.pdf
- Figure 11.10 Visual Landmarks and Sensitivity.pdf
- Figure 11.11 Visual Receptor Location Plan.pdf
- Figure 11.12-11.24 Visual Receptors 1-13.pdf
- Figure 11.25-11.37 Photomontage 1-13.pdf
- Figure 11.38 - Phase 1 Habitat Survey.pdf
- 12 Archaeology and Cultural Heritage
- 13 Drainage, Flooding and Water Resources
- 13. Drainage, Flooding and Water Resources.pdf (revised June 2010)
- Revised Flood Risk Assessment.pdf (revised June 2010)
- 14 Ground Conditions
- 15 Cumulative Effects
- Volume 3 - Technical Appendices
- Statement of Conformity
- Statement_of_Conformity.pdf (July 2010)
- Health Impact Assessment
- Heritage Statement
- Heritage Statement.pdf (June 2010)
- Highway Improvements - Trigger Points
- East Float - Infrastructure Trigger Points.pdf (July 2010)
- Infrastructure Statement
- Infrastructure Statement.pdf (revised June 2010)
- Liverpool Waters Cumulative Assessment
- Liverpool Waters Cumulative Assessment.pdf (June 2010)
- Office Market Report
- Office Market Report.pdf (June 2010)
- Phasing Controls Briefing Note
- Phasing Briefing Note.pdf (July 2010)
- East Float Working Employment Trajectory.pdf (July 2010)
- East Float Working Housing Trajectory.pdf (July 2010)
- Planning Policy Position Statement
- Policy Position Statement.pdf (July 2010)
- Planning Statement
- Public Realm & Green Infrastructure Briefing Note
- Public Realm and Green Infrastructure Briefing Note.pdf (July 2010)
- Public Realm Budget Costs 3.pdf (July 2010)
- Quarter Handbooks
- City Structure.pdf (revised June 2010)
- Marina View and Four Bridges Handbook.pdf (revised June 2010)
- Northbank West Handbook.pdf (revised June 2010)
- SkyCity Handbook.pdf (revised June 2010)
- Vittoria Studios Handbook.pdf (revised June 2010)
- Regeneration Statement
- Retail Briefing Note
- Retail Briefing Note.pdf (July 2010)
- Composite Tables 1-8.pdf (July 2010)
- Supplementary Note re A1-A5 uses.pdf (July 2010)
- Retail, Office and Leisure Statement
- Schedule of Documents
- East Float Application Docs.pdf (July 2010)
- Supplementary Geo-environmental Assessment
- Supplementary Geo-environmental Assessment.pdf (July 2010)
- Sustainability Statement
- Transport Assessment Report
- Transport Assessment Report.pdf
- Appendices and Figures
- Appendix A - Trip Generation and Distribution Scoping Note.pdf
- Appendix B - Indicative Trajectory (with Northbank East).pdf
- Figure 1.pdf
- Figure 2.pdf
- Figure 3.pdf
- Figure 4.pdf
- Plan 1.pdf
- Plan 2.pdf
- Plan 3.pdf
- Plan 4.pdf
- Plan 5.pdf
- Plan 6.pdf
- Plan 7.pdf
- Plan 8.pdf
- Plan 9.pdf
- Plan 10.pdf
- Plan 11.pdf
- Plan 12.pdf
- Plan 13.pdf
- Plan 14.pdf
- Plan 15.pdf
- Plan 16.pdf
- Plan 17.pdf
- Plan 18.pdf
- Affordable Housing & Viability
- Plans
- Plans Front Cover.pdf
- Red edge site boundary plan.pdf
- Illustrative Masterplan
- Neighbourhood Parameter Plans
- Landscape and Public Realm.pdf (revised July 2010)
- Movement and Connections (Ground Plane).pdf (revised July 2010)
- Movement and Connections (Underground).pdf (revised July 2010)
- Quarter Boundaries.pdf (revised July 2010)
- Scale and Massing.pdf (revised July 2010)
- Ground Level Parameter Plan.pdf (revised July 2010)
- Upper Level Parameter Plan.pdf (revised July 2010)
- Quarter Parameter Plans
- Marina View and Four Bridges
- Ground Floor.pdf (revised July 2010)
- Upper Floors.pdf (revised July 2010)
- Movement and Connections.pdf (revised July 2010)
- Scale and Massing.pdf (revised July 2010)
- Northbank West
- Ground Floor.pdf (revised July 2010)
- Upper Floors.pdf (revised July 2010)
- Movement and Connections.pdf (revised July 2010)
- Scale and Massing.pdf (revised July 2010)
- SkyCity
- Ground Floor.pdf (revised July 2010)
- Upper Floors.pdf (revised July 2010)
- Movement and Connections.pdf (revised July 2010)
- Scale and Massing.pdf (revised July 2010)
- Vittoria Studios
- Ground Floor.pdf (revised July 2010)
- Upper Floors.pdf (revised July 2010)
- Movement and Connections.pdf (revised July 2010)
- Scale and Massing.pdf (revised July 2010)
- Marina View and Four Bridges
- Topo Survey

